ITAC Assessment: NV0161
ITAC logo
ITAC Assessment: NV0161
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product metal coating
NAICS
n/a
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 68
Plant Area 48,000
ft2
Annual Production 1,750,000
pieces
Production Hrs. Annual 4,992
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,715 546,000
kWh
Electricity Demand $12,898 1,696
kW-mo/yr
Electricity Fees $325 -
Natural Gas $62,259 10,556
MMBtu
LPG $108,451 11,908
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,279 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,327

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.1113: Reduce combustion air flow to optimum $12,740 - - - - $12,740
-
MMBtu
-
02 2.4133: Use most efficient type of electric motors $307 $468 $193
3,517
kWh
$113
-
kW-mo/yr
$1 - -
03 2.2511: Insulate bare equipment $1,699 $574 - - - $1,699
-
MMBtu
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $654 $249 $430
7,620
kWh
$224
-
kW-mo/yr
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $667 - $502
8,792
kWh
$163
-
kW-mo/yr
$2 - -
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $3,212 $9,788 - - - - $3,212
-
lb
TOTAL RECOMMENDED $19,279 $11,079 $1,125
19,929
kWh
$500
-
kW-mo/yr
$3 $14,439
-
MMBtu
$3,212
-
lb
TOTAL IMPLEMENTED $3,327 $1,291 $1,125
19,929
kWh
$500
-
kW-mo/yr
$3 $1,699
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs