Assessment Year | 2008 |
---|---|
Principal Product | Metal Working Fluids, Various Oils |
NAICS | 324191: Petroleum Lubricating Oil and Grease Manufacturing |
SIC | 2992: Lubricating Oils and Greases |
Sales Range | $10 M to 50M |
# of Employees | 36 |
Plant Area |
60,000
ft2
|
Annual Production | 69,500,000
lb
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $88,981 | 1,246,372 |
kWh
|
$0.071 |
Electricity Demand | $30,605 | 3,045 |
kW-mo/yr
|
$10.05 |
Electricity Fees | $9,421 | - |
|
- |
Natural Gas | $804,354 | 71,800 |
MMBtu
|
$11.20 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $334,900 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2211: Use optimum temperature | $136,461 | $172,800 | - | - |
$136,461
-
MMBtu
|
|
02 | 2.2135: Repair and eliminate steam leaks | $108,562 | $15,000 | - | - |
$108,562
-
MMBtu
|
|
03 | 3.6124: Burn waste oil for heat | $42,258 | $4,000 | - | - |
$42,258
-
MMBtu
|
|
04 | 2.2414: Use waste heat from hot flue gases to preheat | $25,917 | $2,600 | - | - |
$25,917
-
MMBtu
|
|
05 | 2.2414: Use waste heat from hot flue gases to preheat | $15,086 | $2,540 | - | - |
$15,086
-
MMBtu
|
|
06 | 2.2511: Insulate bare equipment | $3,808 | $682 | - | - |
$3,808
-
MMBtu
|
|
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,808 | $4,620 |
$2,024
19,466
kWh
|
$784
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $334,900 | $202,242 |
$2,024
19,466
kWh
|
$784
-
kW-mo/yr
|
$332,092
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs