ITAC Assessment: UM0339
ITAC logo
ITAC Assessment: UM0339
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Metal Working Fluids, Various Oils
NAICS 324191: Petroleum Lubricating Oil and Grease Manufacturing
SIC 2992: Lubricating Oils and Greases
Sales Range $10
M
to 50
M
# of Employees 36
Plant Area 60,000
ft2
Annual Production 69,500,000
lb
Production Hrs. Annual 4,420
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $88,981 1,246,372
kWh
Electricity Demand $30,605 3,045
kW-mo/yr
Electricity Fees $9,421 -
Natural Gas $804,354 71,800
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $334,900 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2211: Use optimum temperature $136,461 $172,800 - - $136,461
-
MMBtu
02 2.2135: Repair and eliminate steam leaks $108,562 $15,000 - - $108,562
-
MMBtu
03 3.6124: Burn waste oil for heat $42,258 $4,000 - - $42,258
-
MMBtu
04 2.2414: Use waste heat from hot flue gases to preheat $25,917 $2,600 - - $25,917
-
MMBtu
05 2.2414: Use waste heat from hot flue gases to preheat $15,086 $2,540 - - $15,086
-
MMBtu
06 2.2511: Insulate bare equipment $3,808 $682 - - $3,808
-
MMBtu
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,808 $4,620 $2,024
19,466
kWh
$784
-
kW-mo/yr
-
TOTAL RECOMMENDED $334,900 $202,242 $2,024
19,466
kWh
$784
-
kW-mo/yr
$332,092
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs