| Assessment Year | 2008 |
|---|---|
| Principal Product | Extruded aluminum tubing |
| NAICS | 331318: Other Aluminum Rolling, Drawing, and Extruding |
| SIC | 3354: Aluminum Extruded Products |
| Sales Range | $10 M to 50M |
| # of Employees | 63 |
| Plant Area |
85,000
ft2
|
| Annual Production | 25,000,000
pieces
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $433,917 | 8,615,645 |
kWh
|
$0.050 |
| Electricity Demand | $228,980 | 22,890 |
kW-mo/yr
|
$10.00 |
| Electricity Fees | $8 | - |
|
- |
| Natural Gas | $79,297 | 7,085 |
MMBtu
|
$11.19 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $78,767 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $30,146 | $38,350 | - | - |
$30,146
-
MMBtu
|
|
| 02 | 2.2437: Recover waste heat from equipment | $16,908 | $4,000 | - | - |
$16,908
-
MMBtu
|
|
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,301 | $19,680 |
$11,443
148,606
kWh
|
$2,858
-
kW-mo/yr
|
- | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $8,640 | $1,400 |
$6,760
87,791
kWh
|
$1,880
-
kW-mo/yr
|
- | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,107 | $900 |
$4,087
53,083
kWh
|
$1,020
-
kW-mo/yr
|
- | |
| 06 | 2.2414: Use waste heat from hot flue gases to preheat | $3,305 | $4,480 |
$1,791
23,266
kWh
|
$451
-
kW-mo/yr
|
$1,063
-
MMBtu
|
|
| 07 | 2.7493: Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses | $257 | $1,095 | - | - |
$257
-
MMBtu
|
|
| 08 | 2.7135: Install occupancy sensors | $103 | $270 |
$103
1,342
kWh
|
- | - | |
| TOTAL RECOMMENDED | $78,767 | $70,175 |
$24,184
314,088
kWh
|
$6,209
-
kW-mo/yr
|
$48,374
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs