Assessment Year | 2007 |
---|---|
Principal Product | Sodium Bicarbonate, Cat Litter, Rumen Bypass Fat |
NAICS | 325180: Other Basic Inorganic Chemical Manufacturing |
SIC | 2812: Alkalies and Chlorine |
Sales Range | $10 M to 50M |
# of Employees | 180 |
Plant Area |
250,000
ft2
|
Annual Production | 421,562
ton
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $681,359 | 27,936,000 |
kWh
|
$0.024 |
Electricity Demand | $562,175 | 41,367 |
kW-mo/yr
|
$13.59 |
Electricity Fees | $1,241 | - |
|
- |
Natural Gas | $1,820,821 | 216,093 |
MMBtu
|
$8.43 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $503,630 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $134,342 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $366,043 | $516,500 |
$(-13,641.0)
(-559,275)
kWh
|
$(-30,402.0)
-
kW-mo/yr
|
$410,086
-
MMBtu
|
|
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $56,464 | $1,000 | - | - |
$56,464
-
MMBtu
|
|
03 | 2.7221: Lower temperature during the winter season and vice-versa | $45,783 | $500 | - | - |
$45,783
-
MMBtu
|
|
04 | 2.2425: Use flue gases to heat process or service water | $26,141 | $12,385 |
$(-1,589.0)
65,144
kWh
|
$(-1,210.0)
-
kW-mo/yr
|
$28,940
-
MMBtu
|
|
05 | 2.4221: Install compressor air intakes in coolest locations | $5,954 | $638 |
$3,372
138,271
kWh
|
$2,582
-
kW-mo/yr
|
- | |
06 | 2.7231: Use radiant heater for spot heating | $2,065 | $10,000 | - | - |
$2,065
-
MMBtu
|
|
07 | 2.2414: Use waste heat from hot flue gases to preheat | $1,180 | $1,540 | - | - |
$1,180
-
MMBtu
|
|
TOTAL RECOMMENDED | $503,630 | $542,563 |
$(-11,858.0)
(-355,860)
kWh
|
$(-29,030.0)
-
kW-mo/yr
|
$544,518
-
MMBtu
|
||
TOTAL IMPLEMENTED | $134,342 | $14,523 |
$1,783
203,415
kWh
|
$1,372
-
kW-mo/yr
|
$131,187
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs