| Assessment Year | 2007 |
|---|---|
| Principal Product | Recycled Industrial Oil and Metalworking Products |
| NAICS | 324191: Petroleum Lubricating Oil and Grease Manufacturing |
| SIC | 2992: Lubricating Oils and Greases |
| Sales Range | $10 M to 50M |
| # of Employees | 25 |
| Plant Area |
3,500
ft2
|
| Annual Production | 5,000
Tgal
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $158,202 | 1,546,186 |
kWh
|
$0.10 |
| Electricity Fees | $493 | - |
|
- |
| Natural Gas | $295,886 | 47,200 |
MMBtu
|
$6.27 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $84,990 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $69,798 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.8114: Change rate schedules or other changes in utility service | $43,338 | - | - | $43,338 | - | |
| 02 | 2.2511: Insulate bare equipment | $14,251 | $5,900 | - | - |
$14,251
-
MMBtu
|
|
| 03 | 2.4239: Eliminate or reduce compressed air usage | $10,446 | $890 |
$10,446
101,414
kWh
|
- | - | |
| 04 | 2.2511: Insulate bare equipment | $6,308 | $6,013 | - | - |
$6,308
-
MMBtu
|
|
| 05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $4,439 | $1,000 | - | - |
$4,439
-
MMBtu
|
|
| 06 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $2,752 | $3,415 | - | - |
$2,752
-
MMBtu
|
|
| 07 | 2.5123: Reduce fluid flow rates | $1,434 | $2,200 | - | - |
$1,434
-
MMBtu
|
|
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $913 | $600 |
$913
8,867
kWh
|
- | - | |
| 09 | 2.2414: Use waste heat from hot flue gases to preheat | $560 | $1,815 | - | - |
$560
-
MMBtu
|
|
| 10 | 2.7134: Use photocell controls | $549 | $190 |
$549
5,331
kWh
|
- | - | |
| TOTAL RECOMMENDED | $84,990 | $22,023 |
$11,908
115,612
kWh
|
$43,338 |
$29,744
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $69,798 | $13,703 |
$1,462
14,198
kWh
|
$43,338 |
$24,998
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | |||