Assessment Year | 2007 |
---|---|
Principal Product | Carbonated and Non-Carbonated Soft Drinks |
NAICS | 312111: Soft Drink Manufacturing |
SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
Sales Range | $100 M to 500M |
# of Employees | 145 |
Plant Area |
363,897
ft2
|
Annual Production | 28,000,000
pieces
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $423,638 | 9,227,524 |
kWh
|
$0.046 |
Electricity Demand | $301,148 | 18,849 |
kW-mo/yr
|
$15.98 |
Electricity Fees | $43,017 | - |
|
- |
Natural Gas | $487,232 | 50,071 |
MMBtu
|
$9.73 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $71,255 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,196 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7234: Use heat pump for space conditioning | $33,455 | $21,730 |
$(-3,089.0)
(-37,211)
kWh
|
$(-556.0)
-
kW-mo/yr
|
$37,100
-
MMBtu
|
- | |
02 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $11,520 | $21,700 | - | - |
$11,520
-
MMBtu
|
- | |
03 | 2.7224: Reduce space conditioning during non-working hours | $9,993 | $1,000 | - | - |
$9,993
-
MMBtu
|
- | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $7,307 | $1,000 | - | - |
$7,307
-
MMBtu
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,338 | - |
$2,785
60,653
kWh
|
$1,553
-
kW-mo/yr
|
- | - | |
06 | 3.4113: Treat and reuse rinse waters | $3,084 | $8,021 | - | - | - |
$3,084
-
Tgal
|
|
07 | 2.7135: Install occupancy sensors | $1,558 | $5,130 |
$1,558
33,940
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $71,255 | $58,581 |
$1,254
57,382
kWh
|
$997
-
kW-mo/yr
|
$65,920
-
MMBtu
|
$3,084
-
Tgal
|
||
TOTAL IMPLEMENTED | $23,196 | $7,130 |
$4,343
94,593
kWh
|
$1,553
-
kW-mo/yr
|
$17,300
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs