ITAC Assessment: UM0317
ITAC logo
ITAC Assessment: UM0317
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product vacuum thermoformed returnable packaging
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 60
Plant Area 99,700
ft2
Annual Production 10,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $266,939 3,444,793
kWh
Electricity Demand $26,287 13,781
kW-mo/yr
Electricity Fees $1,098 -
Natural Gas $192,949 19,283
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $67,012 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $52,359

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2449: Recover heat from exhausted steam, hot air or hot water $24,281 $50,000 $17,320
203,765
kWh
- $6,961
-
MMBtu
02 2.2511: Insulate bare equipment $14,750 $1,970 $14,750
173,485
kWh
- -
03 2.4239: Eliminate or reduce compressed air usage $9,819 $1,700 - - $9,819
-
MMBtu
04 2.2511: Insulate bare equipment $9,662 $6,000 $6,892
81,079
kWh
- $2,770
-
MMBtu
05 2.7135: Install occupancy sensors $3,666 $828 $3,666
47,309
kWh
- -
06 2.7111: Reduce illumination to minimum necessary levels $3,456 $100 $3,300
42,558
kWh
$156
-
kW-mo/yr
-
07 2.4221: Install compressor air intakes in coolest locations $1,378 $410 - - $1,378
-
MMBtu
TOTAL RECOMMENDED $67,012 $61,008 $45,928
548,196
kWh
$156
-
kW-mo/yr
$20,928
-
MMBtu
TOTAL IMPLEMENTED $52,359 $58,798 $42,628
505,638
kWh
- $9,731
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs