Assessment Year | 2006 |
---|---|
Principal Product | Automotive Interiors |
NAICS | 325211: Plastics Material and Resin Manufacturing |
SIC | 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers |
Sales Range | $50 M to 100M |
# of Employees | 0 |
Plant Area |
462,000
ft2
|
Annual Production | 13,000,000
pieces
|
Production Hrs. Annual | 6,280
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,097,845 | 20,182,476 |
kWh
|
$0.054 |
Electricity Demand | $561,002 | 43,624 |
kW-mo/yr
|
$12.86 |
Electricity Fees | $21,577 | - |
|
- |
Natural Gas | $4,593,794 | 306,747 |
MMBtu
|
$14.98 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $187,413 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $526 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $53,281 | $1,800 | - | - | - |
$53,281
-
MMBtu
|
|
02 | 2.2414: Use waste heat from hot flue gases to preheat | $36,263 | $15,000 | - | - |
$36,263
-
MMBtu
|
- | |
03 | 2.2437: Recover waste heat from equipment | $34,667 | $8,066 | - | - |
$34,667
-
MMBtu
|
- | |
04 | 2.2511: Insulate bare equipment | $32,300 | $80,207 | - | - |
$32,300
-
MMBtu
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $27,713 | $40,991 |
$18,612
342,141
kWh
|
$9,101
-
kW-mo/yr
|
- | - | |
06 | 2.2511: Insulate bare equipment | $1,369 | $230 | - | - |
$1,369
-
MMBtu
|
- | |
07 | 2.7131: Add area lighting switches | $1,294 | $1,100 |
$1,294
23,788
kWh
|
- | - | - | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $526 | $225 |
$362
6,651
kWh
|
$164
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $187,413 | $147,619 |
$20,268
372,580
kWh
|
$9,265
-
kW-mo/yr
|
$104,599
-
MMBtu
|
$53,281
-
MMBtu
|
||
TOTAL IMPLEMENTED | $526 | $225 |
$362
6,651
kWh
|
$164
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs