Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Automotive Assembly
NAICS 336112: Light Truck and Utility Vehicle Manufacturing
SIC 3711: Motor Vehicles and Passenger Car Bodies
Sales Range n/a
# of Employees 500
Plant Area 783,665
ft2
Annual Production 20,000
pieces
Production Hrs. Annual 2,040
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $566,647 46,794,618
kWh
Electricity Demand $1,624,222 110,331
kW-mo/yr
Natural Gas $2,399,595 224,036
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $352,433 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2447: Heat water with exhaust heat $292,769 $50,000 - - $292,769
-
MMBtu
02 2.2442: Preheat combustion air with waste heat $32,329 $10,600 - - $32,329
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $11,830 $33,667 $1,452
119,857
kWh
$10,378
-
kW-mo/yr
-
04 2.2437: Recover waste heat from equipment $11,143 $13,000 - - $11,143
-
MMBtu
05 2.2511: Insulate bare equipment $4,362 $7,550 - - $4,362
-
MMBtu
TOTAL RECOMMENDED $352,433 $114,817 $1,452
119,857
kWh
$10,378
-
kW-mo/yr
$340,603
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs