ITAC Assessment: MUCM11
ITAC logo
ITAC Assessment: MUCM11
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Education
NAICS 611310: Colleges, Universities, and Professional Schools
SIC 8221: Colleges, Universities, and Professional Schools
Sales Range less than $500
k
# of Employees 100
Plant Area 69,164
ft2
Annual Production 100
units
Production Hrs. Annual 3,120
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $19,577 535,911
kWh
Electricity Demand $25,209 1,634
kW-mo/yr
Electricity Fees $5,642 -
Natural Gas $52,002 7,012
MMBtu
Waste Disposal Costs
Water Usage $2,012 728
Tgal
Water Disposal $3,145 2,764
Tgal
TOTAL YEARLY COSTS $107,587
RECOMMENDED SAVINGS* $4,192 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,205 $7,568 $530
13,253
kWh
$281
-
kW-mo/yr
$2,394
-
MMBtu
02 2.6218: Turn off equipment when not in use $284 - $186
4,638
kWh
$98
-
kW-mo/yr
-
03 2.7111: Reduce illumination to minimum necessary levels $169 - $110
2,761
kWh
$58
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $163 $127 $96
2,393
kWh
$68
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $371 $1,260 $243
6,071
kWh
$128
-
kW-mo/yr
-
TOTAL RECOMMENDED $4,192 $8,955 $1,165
29,116
kWh
$633
-
kW-mo/yr
$2,394
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs