ITAC Assessment: UM0289
ITAC logo
ITAC Assessment: UM0289
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Various Forms of Asphalt
NAICS 336350: Motor Vehicle Transmission and Power Train Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range n/a
# of Employees 37
Plant Area 116,700
ft2
Annual Production 83,000
ton
Production Hrs. Annual 8,736
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $98,839 3,648,000
kWh
Electricity Demand $144,928 7,451
kW-mo/yr
Electricity Fees $13,380 -
Natural Gas $1,361,016 192,111
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $284,782 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $227,651

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $164,291 $74,114 - - $164,291
-
MMBtu
02 2.2443: Re-use or recycle hot or cold process exhaust air $56,272 $85,815 - - $56,272
-
MMBtu
03 2.2136: Install / repair insulation on steam lines $37,184 $11,610 - - $37,184
-
MMBtu
04 2.1233: Analyze flue gas for proper air/fuel ratio $16,576 $2,500 - - $16,576
-
MMBtu
05 2.2135: Repair and eliminate steam leaks $9,600 $1,400 - - $9,600
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $859 $2,663 $320
11,794
kWh
$539
-
kW-mo/yr
-
TOTAL RECOMMENDED $284,782 $178,102 $320
11,794
kWh
$539
-
kW-mo/yr
$283,923
-
MMBtu
TOTAL IMPLEMENTED $227,651 $89,624 - - $227,651
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs