ITAC Assessment: UM0278
ITAC logo
ITAC Assessment: UM0278
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Turbine Engine Components
NAICS 336412: Aircraft Engine and Engine Parts Manufacturing
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $10
M
to 50
M
# of Employees 243
Plant Area 210,000
ft2
Annual Production 10,800
pieces
Production Hrs. Annual 3,770
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $159,490 3,815,449
kWh
Electricity Demand $102,043 10,420
kW-mo/yr
Electricity Fees $7,980 -
Natural Gas $138,734 19,746
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,169 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,696

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2514: Cover open tanks $33,962 $480 $13,634
326,162
kWh
$20,328
-
kW-mo/yr
-
02 2.2437: Recover waste heat from equipment $6,116 $2,200 - - $6,116
-
MMBtu
03 2.4239: Eliminate or reduce compressed air usage $1,140 $3,000 $653
15,626
kWh
$487
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $618 $184 $618
14,778
kWh
- -
05 2.7243: Improve air circulation with destratification fans / other methods $333 $850 - - $333
-
MMBtu
TOTAL RECOMMENDED $42,169 $6,714 $14,905
356,566
kWh
$20,815
-
kW-mo/yr
$6,449
-
MMBtu
TOTAL IMPLEMENTED $40,696 $2,864 $14,252
340,940
kWh
$20,328
-
kW-mo/yr
$6,116
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs