ITAC Assessment: UM0271
ITAC logo
ITAC Assessment: UM0271
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Machine Glazed Paper
NAICS 322121: Paper (except Newsprint) Mills
SIC 2621: Paper Mills
Sales Range $100
M
to 500
M
# of Employees 290
Plant Area 318,000
ft2
Annual Production 32,000
ton
Production Hrs. Annual 8,736
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $612,681 26,686,278
kWh
Electricity Demand $235,834 52,834
kW-mo/yr
Electricity Fees $8,547 -
Natural Gas $122,467 24,319
MMBtu
Coal $1,177,963 376,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $782,781 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Coal Savings Administrative Changes Savings
01 2.1331: Burn a less expensive grade of fuel $542,255 $2,000,000 - - - - $542,255
02 2.2449: Recover heat from exhausted steam, hot air or hot water $145,057 $125,000 - - - $145,057
-
MMBtu
-
03 2.2135: Repair and eliminate steam leaks $46,000 $46,000 - - - $46,000
-
MMBtu
-
04 2.2449: Recover heat from exhausted steam, hot air or hot water $24,731 $30,000 - - $24,731
-
MMBtu
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $11,485 $27,143 $9,066
394,868
kWh
$2,419
-
kW-mo/yr
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,777 $975 $7,731
336,145
kWh
$2,046
-
kW-mo/yr
- - -
07 2.7491: Insulate glazing, walls, ceilings, and roofs $2,064 $1,921 - - $2,064
-
MMBtu
- -
08 2.7135: Install occupancy sensors $1,412 $828 $1,412
61,503
kWh
- - - -
TOTAL RECOMMENDED $782,781 $2,231,867 $18,209
792,516
kWh
$4,465
-
kW-mo/yr
$26,795
-
MMBtu
$191,057
-
MMBtu
$542,255
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Coal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs