Assessment Year | 2004 |
---|---|
Principal Product | Industrial Paint |
NAICS | 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing |
SIC | 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 49 |
Plant Area |
50,000
ft2
|
Annual Production | 3,650,000
pieces
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $87,399 | 917,480 |
kWh
|
$0.095 |
Electricity Fees | $1,193 | - |
|
- |
Natural Gas | $239,307 | 31,027 |
MMBtu
|
$7.71 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $130,444 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $17,391 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|
01 | 3.4111: Use closed cycle process to minimize waste water production | $96,676 | $11,096 |
$(-853.0)
(-8,952)
kWh
|
$92,983
-
MMBtu
|
- |
$4,546
-
Tgal
|
|
02 | 2.2414: Use waste heat from hot flue gases to preheat | $16,377 | $47,700 |
$(-623.0)
(-6,535)
kWh
|
$20,000
-
MMBtu
|
$(-3,000.0) | - | |
03 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $7,493 | $2,000 | - |
$7,493
-
MMBtu
|
- | - | |
04 | 2.2511: Insulate bare equipment | $6,503 | $500 | - |
$6,503
-
MMBtu
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,770 | $1,711 |
$2,770
28,560
kWh
|
- | - | - | |
06 | 2.2514: Cover open tanks | $625 | $300 | - |
$625
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $130,444 | $63,307 |
$1,294
13,073
kWh
|
$127,604
-
MMBtu
|
$(-3,000.0) |
$4,546
-
Tgal
|
||
TOTAL IMPLEMENTED | $17,391 | $4,511 |
$2,770
28,560
kWh
|
$14,621
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs