ITAC Assessment: UM0258
ITAC logo
ITAC Assessment: UM0258
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Stampings and Welded Assemblies
NAICS 336370: Motor Vehicle Metal Stamping
SIC 3465: Automotive Stampings
Sales Range $10
M
to 50
M
# of Employees 115
Plant Area 125,000
ft2
Annual Production 50,000,000
pieces
Production Hrs. Annual 5,760
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $214,684 4,903,506
kWh
Electricity Demand $27,304 6,595
kW-mo/yr
Natural Gas $161,937 22,327
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $69,379 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $29,426 $500 - - $29,426
-
MMBtu
02 2.2414: Use waste heat from hot flue gases to preheat $15,300 $15,300 - - $15,300
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,545 $1,275 $5,621
107,166
kWh
$924
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $4,828 $900 $4,146
79,055
kWh
$682
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $4,117 $7,220 $4,117
79,170
kWh
- -
06 2.4239: Eliminate or reduce compressed air usage $3,963 $2,000 $3,403
64,888
kWh
$560
-
kW-mo/yr
-
07 2.7135: Install occupancy sensors $2,720 $5,925 $2,720
53,325
kWh
- -
08 2.2437: Recover waste heat from equipment $2,480 $500 - - $2,480
-
MMBtu
TOTAL RECOMMENDED $69,379 $33,620 $20,007
383,604
kWh
$2,166
-
kW-mo/yr
$47,206
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs