ITAC Assessment: UM0255
ITAC logo
ITAC Assessment: UM0255
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Linens and Garments
NAICS 315210: Cut and Sew Apparel Contractors
SIC 2389: Apparel and Accessories, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 51,000
ft2
Annual Production 13,780,000
lb
Production Hrs. Annual 4,420
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $72,647 1,474,045
kWh
Electricity Demand $22,964 4,683
kW-mo/yr
Electricity Fees $1,151 -
Natural Gas $171,369 33,648
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,743 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,220

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.2511: Insulate bare equipment $10,323 $6,486 - - $10,323
-
MMBtu
-
02 2.2449: Recover heat from exhausted steam, hot air or hot water $6,279 $2,497 $(-600.0)
(-8,952)
kWh
$(-56.0)
-
kW-mo/yr
$7,935
-
MMBtu
$(-1,000.0)
03 2.4133: Use most efficient type of electric motors $6,622 $9,734 $4,646
94,238
kWh
$1,976
-
kW-mo/yr
- -
04 2.1233: Analyze flue gas for proper air/fuel ratio $5,618 $2,500 - - $6,668
-
MMBtu
$(-1,050.0)
05 2.2425: Use flue gases to heat process or service water $2,917 $8,000 - - $2,917
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,984 $2,960 $1,562
31,691
kWh
$422
-
kW-mo/yr
- -
TOTAL RECOMMENDED $33,743 $32,177 $5,608
116,977
kWh
$2,342
-
kW-mo/yr
$27,843
-
MMBtu
$(-2,050.0)
TOTAL IMPLEMENTED $22,220 $11,483 $(-600.0)
(-8,952)
kWh
$(-56.0)
-
kW-mo/yr
$24,926
-
MMBtu
$(-2,050.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs