| Assessment Year | 2004 |
|---|---|
| Principal Product | High purity chemicals |
| NAICS | 325199: All Other Basic Organic Chemical Manufacturing |
| SIC | 2869: Industrial Organic Chemicals, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 115 |
| Plant Area |
95,000
ft2
|
| Annual Production | 1,600
Tgal
|
| Production Hrs. Annual | 6,120
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $116,130 | 2,350,178 |
kWh
|
$0.049 |
| Electricity Demand | $14,564 | 1,561 |
kW-mo/yr
|
$9.33 |
| Electricity Fees | $1,542 | - |
|
- |
| Natural Gas | $168,958 | 26,417 |
MMBtu
|
$6.40 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $60,152 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $22,046 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 4.212: Adopt in-house material generation | $31,255 | $30,000 |
$(-31,357.0)
(-885,043)
kWh
|
$(-1,082.0)
-
kW-mo/yr
|
- | $63,694 | |
| 02 | 2.7221: Lower temperature during the winter season and vice-versa | $9,650 | $2,200 | - | - |
$9,650
-
MMBtu
|
- | |
| 03 | 2.8114: Change rate schedules or other changes in utility service | $6,907 | - | - | - | - | $6,907 | |
| 04 | 2.2426: Use waste heat from flue gases to heat space conditioning air | $3,584 | $15,000 | - | - |
$3,584
-
MMBtu
|
- | |
| 05 | 2.3191: Use demand controller or load shedder | $3,267 | $10,000 | - |
$3,267
-
kW-mo/yr
|
- | - | |
| 06 | 2.2136: Install / repair insulation on steam lines | $3,010 | $1,080 | - | - |
$3,010
-
MMBtu
|
- | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,479 | $1,038 |
$1,608
44,928
kWh
|
$871
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $60,152 | $59,318 |
$(-29,749.0)
(-840,115)
kWh
|
$3,056
-
kW-mo/yr
|
$16,244
-
MMBtu
|
$70,601 | ||
| TOTAL IMPLEMENTED | $22,046 | $4,318 |
$1,608
44,928
kWh
|
$871
-
kW-mo/yr
|
$12,660
-
MMBtu
|
$6,907 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs