Assessment Year | 2004 |
---|---|
Principal Product | Rubber Injection Moldings |
NAICS | 326291: Rubber Product Manufacturing for Mechanical Use |
SIC | 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods |
Sales Range | $10 M to 50M |
# of Employees | 360 |
Plant Area |
125,000
ft2
|
Annual Production | 4,000,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $569,041 | 6,766,746 |
kWh
|
$0.084 |
Electricity Demand | $19,927 | 10,896 |
kW-mo/yr
|
$1.83 |
Electricity Fees | $(-55,329.0) | - |
|
- |
Natural Gas | $46,241 | 5,314 |
MMBtu
|
$8.70 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $91,841 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $66,736 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.8114: Change rate schedules or other changes in utility service | $47,515 | $40,000 | - | - | $47,515 | - | - | - | |
02 | 2.2437: Recover waste heat from equipment | $25,105 | $17,104 | n/a |
$(-395.0)
(-7,063)
kWh
|
$(-138.0)
-
kW-mo/yr
|
- |
$25,638
-
MMBtu
|
- | - |
03 | 3.3122: Use filtration, centrifuging to remove contaminants | $9,272 | $16,000 |
$(-295.0)
(-3,097)
kWh
|
- | - | - |
$13,104
-
gal
|
$(-3,537.0) | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,381 | $400 |
$4,524
62,127
kWh
|
$857
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,568 | $3,999 |
$4,065
72,726
kWh
|
$503
-
kW-mo/yr
|
- | - | - | - | |
TOTAL RECOMMENDED | $91,841 | $77,503 |
$7,899
124,693
kWh
|
$1,222
-
kW-mo/yr
|
$47,515 |
$25,638
-
MMBtu
|
$13,104
-
gal
|
$(-3,537.0) | ||
TOTAL IMPLEMENTED | $66,736 | $60,399 |
$8,294
131,756
kWh
|
$1,360
-
kW-mo/yr
|
$47,515 | - |
$13,104
-
gal
|
$(-3,537.0) |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs