Assessment Year | 2003 |
---|---|
Principal Product | Refrigeration Compressors and Units |
NAICS | 336390: Other Motor Vehicle Parts Manufacturing |
SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
Sales Range | $100 M to 500M |
# of Employees | 850 |
Plant Area |
750,000
ft2
|
Annual Production | 825,000
pieces
|
Production Hrs. Annual | 1,980
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $797,675 | 23,508,130 |
kWh
|
$0.034 |
Electricity Demand | $510,747 | 58,981 |
kW-mo/yr
|
$8.66 |
Electricity Fees | $30,408 | - |
|
- |
Natural Gas | $841,086 | 170,157 |
MMBtu
|
$4.94 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $473,514 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $367,343 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4322: Use or replace with energy efficient substitutes | $247,018 | $270,000 |
$7,794
229,731
kWh
|
$12,055
-
kW-mo/yr
|
$37,169
-
MMBtu
|
- | $190,000 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $82,330 | $148,050 |
$45,220
1,332,651
kWh
|
$37,110
-
kW-mo/yr
|
- | - | - | |
03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $80,476 | $15,000 |
$7,166
211,200
kWh
|
- |
$3,310
-
MMBtu
|
- | $70,000 | |
04 | 2.4239: Eliminate or reduce compressed air usage | $35,180 | $1,100 |
$16,146
476,251
kWh
|
$19,034
-
kW-mo/yr
|
- | - | - | |
05 | 2.2511: Insulate bare equipment | $18,295 | $24,675 | - | - |
$18,295
-
MMBtu
|
- | - | |
06 | 2.2514: Cover open tanks | $7,400 | $3,290 | - | - |
$6,995
-
MMBtu
|
$405
-
Tgal
|
- | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,815 | $300 |
$1,290
38,040
kWh
|
$1,525
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $473,514 | $462,415 |
$77,616
2,287,873
kWh
|
$69,724
-
kW-mo/yr
|
$65,769
-
MMBtu
|
$405
-
Tgal
|
$260,000 | ||
TOTAL IMPLEMENTED | $367,343 | $419,450 |
$70,450
2,076,673
kWh
|
$69,724
-
kW-mo/yr
|
$37,169
-
MMBtu
|
- | $190,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs