| Assessment Year | 2003 |
|---|---|
| Principal Product | Plating |
| NAICS | 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring |
| SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
| Sales Range | $10 M to 50M |
| # of Employees | 125 |
| Plant Area |
50,000
ft2
|
| Annual Production | 6,000,000
pieces
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $270,439 | 6,067,279 |
kWh
|
$0.045 |
| Electricity Demand | $62,268 | 4,373 |
kW-mo/yr
|
$14.24 |
| Electricity Fees | $9,707 | - |
|
- |
| Natural Gas | $72,466 | 11,381 |
MMBtu
|
$6.37 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $72,646 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $30,846 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $41,800 | $32,000 | - | - |
$27,900
-
MMBtu
|
$13,900
-
Tgal
|
- | |
| 02 | 2.2437: Recover waste heat from equipment | $2,064 | $500 | - | - |
$2,064
-
MMBtu
|
- | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,745 | $150 |
$1,061
23,892
kWh
|
$684
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,037 | $50 |
$629
14,113
kWh
|
$408
-
kW-mo/yr
|
- | - | - | |
| 05 | 3.4114: Replace city water with recycled water via cooling tower | $26,000 | $119,000 |
$(-800.0)
(-18,000)
kWh
|
$(-520.0)
-
kW-mo/yr
|
- |
$28,820
-
Tgal
|
$(-1,500.0) | |
| TOTAL RECOMMENDED | $72,646 | $151,700 |
$890
20,005
kWh
|
$572
-
kW-mo/yr
|
$29,964
-
MMBtu
|
$42,720
-
Tgal
|
$(-1,500.0) | ||
| TOTAL IMPLEMENTED | $30,846 | $119,700 |
$890
20,005
kWh
|
$572
-
kW-mo/yr
|
$2,064
-
MMBtu
|
$28,820
-
Tgal
|
$(-1,500.0) | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs