ITAC Assessment: AM0709
ITAC logo
ITAC Assessment: AM0709
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Processed meats
NAICS 311611: Animal (except Poultry) Slaughtering
SIC 2011: Meat Packing Plants
Sales Range $50
M
to 100
M
# of Employees 375
Plant Area 50,000
ft2
Annual Production 52,000,000
lb
Production Hrs. Annual 6,510
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,122,936 10,819,860
kWh
Natural Gas $240,073 72,888
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,919 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,884

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1231: Establish burner maintenance schedule for boilers $7,770 $1,520 - $7,770
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,800 $13,090 $5,800
55,900
kWh
-
03 2.2113: Repair or replace steam traps $3,460 $40 - $3,460
-
MMBtu
04 2.4314: Use synthetic lubricant $2,314 - $2,314
22,294
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $355 - $355
3,423
kWh
-
06 2.2511: Insulate bare equipment $220 $460 - $220
-
MMBtu
TOTAL RECOMMENDED $19,919 $15,110 $8,469
81,617
kWh
$11,450
-
MMBtu
TOTAL IMPLEMENTED $15,884 $14,610 $8,114
78,194
kWh
$7,770
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs