ITAC Assessment: MS0118
ITAC logo
ITAC Assessment: MS0118
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Upholstered Furniture
NAICS
n/a
SIC 2512: Wood Household Furniture, Upholstered
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 140,000
ft2
Annual Production 50,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $32,185 825,029
kWh
Electricity Demand $38,317 4,596
kW-mo/yr
Electricity Fees $2,714 -
Natural Gas $7,292 1,384
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,919 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,919

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.2437: Recover waste heat from equipment $1,152 $925 - - $1,152
-
MMBtu
-
02 2.3212: Optimize plant power factor $818 $390 - $818 - -
03 2.6214: Shut off pilots in standby equipment $777 $20 - - $777
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $698 $469 $688
20,809
kWh
$10 - -
05 3.5313: Increase amount of waste recovered for resale $10,474 $1,968 - - - $10,474
-
lb
TOTAL RECOMMENDED $13,919 $3,772 $688
20,809
kWh
$828 $1,929
-
MMBtu
$10,474
-
lb
TOTAL IMPLEMENTED $13,919 $3,772 $688
20,809
kWh
$828 $1,929
-
MMBtu
$10,474
-
lb
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs