Assessment Year | 2002 |
---|---|
Principal Product | Extruded Rubber Hoses |
NAICS | 326291: Rubber Product Manufacturing for Mechanical Use |
SIC | 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods |
Sales Range | $50 M to 100M |
# of Employees | 465 |
Plant Area |
236,000
ft2
|
Annual Production | 40,000,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $394,674 | 12,603,243 |
kWh
|
$0.031 |
Electricity Demand | $286,402 | 30,152 |
kW-mo/yr
|
$9.50 |
Electricity Fees | $99,317 | - |
|
- |
Natural Gas | $919,294 | 179,762 |
MMBtu
|
$5.11 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $274,781 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $135,839 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,438 | $21,682 |
$5,125
170,654
kWh
|
$2,313
-
kW-mo/yr
|
- | - | - | |
02 | 2.7243: Improve air circulation with destratification fans / other methods | $2,265 | $700 | - | - | - |
$2,265
-
MMBtu
|
- | |
03 | 2.3212: Optimize plant power factor | $21,643 | $15,930 | - | - | $21,643 | - | - | |
04 | 3.4111: Use closed cycle process to minimize waste water production | $51,840 | $5,520 | - | - | - | - |
$51,840
-
Tgal
|
|
05 | 2.2135: Repair and eliminate steam leaks | $26,100 | $7,230 | - | - | - |
$26,100
-
MMBtu
|
- | |
06 | 3.3131: Use evaporation to concentrate material | $57,600 | $19,600 | - | - | - |
$(-14,600.0)
-
MMBtu
|
$72,200
-
Tgal
|
|
07 | 2.2136: Install / repair insulation on steam lines | $2,606 | $934 | - | - | - |
$2,606
-
MMBtu
|
- | |
08 | 2.2111: Install steam trap | $1,031 | $4,360 | - | - | - |
$232
-
MMBtu
|
$799
-
Tgal
|
|
09 | 2.4235: Remove or close off unneeded compressed air lines | $2,650 | $120 |
$1,387
44,300
kWh
|
$1,263
-
kW-mo/yr
|
- | - | - | |
10 | 2.4239: Eliminate or reduce compressed air usage | $53,338 | $12,600 |
$33,200
1,103,651
kWh
|
$20,138
-
kW-mo/yr
|
- | - | - | |
11 | 2.3191: Use demand controller or load shedder | $17,270 | $10,000 | - |
$17,270
-
kW-mo/yr
|
- | - | - | |
12 | 2.1233: Analyze flue gas for proper air/fuel ratio | $31,000 | $2,500 | - | - | - |
$31,000
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $274,781 | $101,176 |
$39,712
1,318,605
kWh
|
$40,984
-
kW-mo/yr
|
$21,643 |
$47,603
-
MMBtu
|
$124,839
-
Tgal
|
||
TOTAL IMPLEMENTED | $135,839 | $32,234 |
$1,387
44,300
kWh
|
$1,263
-
kW-mo/yr
|
$21,643 |
$59,706
-
MMBtu
|
$51,840
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs