ITAC Assessment: UM0220
ITAC logo
ITAC Assessment: UM0220
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Pre-form cutting tools
NAICS
n/a
SIC 3054:
Sales Range $5
M
to 10
M
# of Employees 101
Plant Area 33,112
ft2
Annual Production 704,552
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $100,908 3,146,311
kWh
Electricity Demand $69,838 7,316
kW-mo/yr
Electricity Fees $16 -
Natural Gas $5,811 1,271
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,561 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,353

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $12,258 $25,000 $410
13,284
kWh
$12,172
-
kW-mo/yr
$(-324.0)
-
MMBtu
-
02 3.7311: Maintain machines to reduce leaks $7,380 $1,150 - - - $7,380
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $973 $1,700 $584
21,218
kWh
$389
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,947 $2,064 $1,524
55,232
kWh
$1,423
-
kW-mo/yr
- -
05 2.7229: Air condition only space necessary $4,385 $800 $2,582
93,700
kWh
$1,803
-
kW-mo/yr
- -
06 2.6242: Minimize operation of equipment maintained in standby condition $1,928 $2,400 $1,928
43,811
kWh
- - -
07 2.3191: Use demand controller or load shedder $6,690 $10,000 - $6,690
-
kW-mo/yr
- -
TOTAL RECOMMENDED $36,561 $43,114 $7,028
227,245
kWh
$22,477
-
kW-mo/yr
$(-324.0)
-
MMBtu
$7,380
TOTAL IMPLEMENTED $8,353 $2,850 $584
21,218
kWh
$389
-
kW-mo/yr
- $7,380
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs