ITAC Assessment: UM0201
ITAC logo
ITAC Assessment: UM0201
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Rolled Aluminum Sheet
NAICS
n/a
SIC 3353: Aluminum Sheet, Plate, and Foil
Sales Range n/a
# of Employees 957
Plant Area 1,333,650
ft2
Annual Production 710,000
ton
Production Hrs. Annual 8,736
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $12,339,480 423,395,083
kWh
Electricity Demand $380,557 62,002
kW-mo/yr
Electricity Fees $220,474 -
Natural Gas $16,427,926 2,724,213
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,061,547 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $972,000 $3,390,000 n/a - $972,000
-
MMBtu
02 2.2414: Use waste heat from hot flue gases to preheat $493,600 $1,060,000 n/a - $493,600
-
MMBtu
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $519,147 $1,100,000 $290,000
9,493,200
kWh
$229,147
-
MMBtu
04 2.2414: Use waste heat from hot flue gases to preheat $76,800 $348,000 - $76,800
-
MMBtu
TOTAL RECOMMENDED $2,061,547 $5,898,000 $290,000
9,493,200
kWh
$1,771,547
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs