| Assessment Year | 2001 |
|---|---|
| Principal Product | Automotive Specialty Products |
| NAICS |
n/a
|
| SIC | 3469: Metal Stampings, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 95 |
| Plant Area |
100,000
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $72,662 | 2,162,075 |
kWh
|
$0.034 |
| Electricity Demand | $84,713 | 4,596 |
kW-mo/yr
|
$18.43 |
| Electricity Fees | $34,983 | - |
|
- |
| Natural Gas | $37,391 | 9,693 |
MMBtu
|
$3.86 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $62,420 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $56,771 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.3212: Optimize plant power factor | $27,600 | $7,600 | - | - | $27,600 | - | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,649 | $10,474 |
$3,388
92,614
kWh
|
$2,261
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.7111: Reduce illumination to minimum necessary levels | $1,341 | $800 |
$1,341
40,152
kWh
|
- | - | - | - | |
| 04 | 2.7243: Improve air circulation with destratification fans / other methods | $6,130 | $3,850 | - | - | - |
$6,130
-
MMBtu
|
- | |
| 05 | 2.2531: Re-size charging openings or add movable cover or door | $700 | $700 | - | - | - |
$700
-
MMBtu
|
- | |
| 06 | 3.5311: Recover and reuse waste material | $21,000 | $20,000 | - | - | - | - |
$21,000
-
lb
|
|
| TOTAL RECOMMENDED | $62,420 | $43,424 |
$4,729
132,766
kWh
|
$2,261
-
kW-mo/yr
|
$27,600 |
$6,830
-
MMBtu
|
$21,000
-
lb
|
||
| TOTAL IMPLEMENTED | $56,771 | $32,950 |
$1,341
40,152
kWh
|
- | $27,600 |
$6,830
-
MMBtu
|
$21,000
-
lb
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs