ITAC Assessment: UM0192
ITAC logo
ITAC Assessment: UM0192
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Automotive Specialty Products
NAICS
n/a
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area 100,000
ft2
Annual Production 0
units
Production Hrs. Annual 8,736
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $72,662 2,162,075
kWh
Electricity Demand $84,713 4,596
kW-mo/yr
Electricity Fees $34,983 -
Natural Gas $37,391 9,693
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $62,420 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $56,771

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.3212: Optimize plant power factor $27,600 $7,600 - - $27,600 - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,649 $10,474 $3,388
92,614
kWh
$2,261
-
kW-mo/yr
- - -
03 2.7111: Reduce illumination to minimum necessary levels $1,341 $800 $1,341
40,152
kWh
- - - -
04 2.7243: Improve air circulation with destratification fans / other methods $6,130 $3,850 - - - $6,130
-
MMBtu
-
05 2.2531: Re-size charging openings or add movable cover or door $700 $700 - - - $700
-
MMBtu
-
06 3.5311: Recover and reuse waste material $21,000 $20,000 - - - - $21,000
-
lb
TOTAL RECOMMENDED $62,420 $43,424 $4,729
132,766
kWh
$2,261
-
kW-mo/yr
$27,600 $6,830
-
MMBtu
$21,000
-
lb
TOTAL IMPLEMENTED $56,771 $32,950 $1,341
40,152
kWh
- $27,600 $6,830
-
MMBtu
$21,000
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs