Assessment Year | 2001 |
---|---|
Principal Product | Steel Castings |
NAICS |
n/a
|
SIC | 3324: Steel Investment Foundries |
Sales Range | $5 M to 10M |
# of Employees | 53 |
Plant Area |
40,500
ft2
|
Annual Production | 625
ton
|
Production Hrs. Annual | 4,940
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $71,576 | 1,838,218 |
kWh
|
$0.039 |
Electricity Demand | $53,521 | 2,904 |
kW-mo/yr
|
$18.43 |
Electricity Fees | $14,849 | - |
|
- |
Natural Gas | $39,406 | 9,466 |
MMBtu
|
$4.16 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $36,537 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4239: Eliminate or reduce compressed air usage | $7,060 | $1,400 |
$2,899
41,032
kWh
|
$4,161
-
kW-mo/yr
|
- | - | - | |
02 | 2.4239: Eliminate or reduce compressed air usage | $2,362 | $1,500 |
$677
17,292
kWh
|
$1,685
-
kW-mo/yr
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,120 | $750 |
$1,672
23,740
kWh
|
$1,448
-
kW-mo/yr
|
- | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,845 | $1,284 |
$1,032
34,291
kWh
|
$1,813
-
kW-mo/yr
|
- | - | - | |
05 | 2.2414: Use waste heat from hot flue gases to preheat | $6,900 | $8,250 | - | - |
$6,900
-
MMBtu
|
- | - | |
06 | 3.4115: Recover and reuse cooling water | $12,000 | $4,400 | - | - | - |
$12,000
-
Tgal
|
- | |
07 | 4.652: Replace existing equipment with more suitable substitutes | $2,250 | $1,950 | - | - | - | - | $2,250 | |
TOTAL RECOMMENDED | $36,537 | $19,534 |
$6,280
116,355
kWh
|
$9,107
-
kW-mo/yr
|
$6,900
-
MMBtu
|
$12,000
-
Tgal
|
$2,250 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs