Assessment Year | 2001 |
---|---|
Principal Product | Corrugated Board |
NAICS |
n/a
|
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $10 M to 50M |
# of Employees | 104 |
Plant Area |
196,000
ft2
|
Annual Production | 33,600
ton
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $119,630 | 4,342,907 |
kWh
|
$0.028 |
Electricity Demand | $172,007 | 9,456 |
kW-mo/yr
|
$18.19 |
Electricity Fees | $7,105 | - |
|
- |
Natural Gas | $262,576 | 61,079 |
MMBtu
|
$4.30 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $29,854 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,460 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $6,100 | $800 | - | - |
$6,100
-
MMBtu
|
- | |
02 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $4,700 | $2,000 | - | - |
$1,000
-
MMBtu
|
$3,700
-
Tgal
|
|
03 | 2.7243: Improve air circulation with destratification fans / other methods | $6,344 | $5,200 | - | - |
$6,344
-
MMBtu
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,181 | $375 |
$312
10,563
kWh
|
$869
-
kW-mo/yr
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,279 | $1,688 |
$745
25,160
kWh
|
$534
-
kW-mo/yr
|
- | - | |
06 | 3.4115: Recover and reuse cooling water | $10,250 | $2,000 | - | - | - |
$10,250
-
Tgal
|
|
TOTAL RECOMMENDED | $29,854 | $12,063 |
$1,057
35,723
kWh
|
$1,403
-
kW-mo/yr
|
$13,444
-
MMBtu
|
$13,950
-
Tgal
|
||
TOTAL IMPLEMENTED | $2,460 | $2,063 |
$1,057
35,723
kWh
|
$1,403
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs