Assessment Year | 2001 |
---|---|
Principal Product | Die Castings |
NAICS |
n/a
|
SIC | 3314: |
Sales Range | $10 M to 50M |
# of Employees | 70 |
Plant Area |
100,000
ft2
|
Annual Production | 1,500
ton
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $348,503 | 7,447,291 |
kWh
|
$0.047 |
Electricity Demand | $130,974 | 11,112 |
kW-mo/yr
|
$11.79 |
Electricity Fees | $111,867 | - |
|
- |
Natural Gas | $265,261 | 43,153 |
MMBtu
|
$6.15 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $230,576 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $57,471 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7111: Reduce illumination to minimum necessary levels | $3,400 | $600 |
$3,400
43,200
kWh
|
- | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,546 | $450 |
$3,546
44,885
kWh
|
- | - | - | |
03 | 2.3212: Optimize plant power factor | $4,605 | $24,000 | - | $4,605 | - | - | |
04 | 2.2514: Cover open tanks | $13,500 | $12,000 | - | - |
$13,500
-
MMBtu
|
- | |
05 | 4.111: Add equipment/ operators to reduce production bottleneck | $50,525 | $10,000 | - | - |
$5,525
-
MMBtu
|
$45,000 | |
06 | 4.111: Add equipment/ operators to reduce production bottleneck | $126,200 | $115,000 | - | - |
$9,200
-
MMBtu
|
$117,000 | |
07 | 4.611: Begin a practice of predictive / preventative maintenance | $28,800 | $30,000 | - | - | - | $28,800 | |
TOTAL RECOMMENDED | $230,576 | $192,050 |
$6,946
88,085
kWh
|
$4,605 |
$28,225
-
MMBtu
|
$190,800 | ||
TOTAL IMPLEMENTED | $57,471 | $11,050 |
$6,946
88,085
kWh
|
- |
$5,525
-
MMBtu
|
$45,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs