ITAC Assessment: UM0183
ITAC logo
ITAC Assessment: UM0183
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Malted Beverages
NAICS
n/a
SIC 2082: Malt Beverages
Sales Range $5
M
to 10
M
# of Employees 20
Plant Area 39,000
ft2
Annual Production 388
Tgal
Production Hrs. Annual 2,600
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $80,060 1,153,576
kWh
Electricity Demand $21,950 3,192
kW-mo/yr
Electricity Fees $1,672 -
Natural Gas $15,260 4,237
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,360 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
01 2.2112: Use correct size steam traps $2,880 $2,500 n/a - $2,880
-
MMBtu
- -
02 2.7135: Install occupancy sensors $1,400 $1,200 n/a $1,400
19,924
kWh
- - -
03 2.2628: Utilize a less expensive cooling method $700 $3,000 n/a $700
7,325
kWh
- - -
04 3.4113: Treat and reuse rinse waters $780 $1,000 n/a - - $780
-
Tgal
-
05 3.4151: Minimize water usage $2,400 $5,000 n/a - - $2,400
-
Tgal
-
06 2.7496: Install partitions to reduce size of conditioned space $4,900 $7,400 n/a $900
9,962
kWh
- - $4,000
07 4.611: Begin a practice of predictive / preventative maintenance $2,500 $1,000 n/a - - - $2,500
08 3.5313: Increase amount of waste recovered for resale $10,800 $14,400 n/a - - - $10,800
TOTAL RECOMMENDED $26,360 $35,500 $3,000
37,211
kWh
$2,880
-
MMBtu
$3,180
-
Tgal
$17,300
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings