Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Foundry Equipment
NAICS
n/a
SIC 3297: Nonclay Refractories
Sales Range $1
M
to 5
M
# of Employees 48
Plant Area 34,000
ft2
Annual Production 5,525
ton
Production Hrs. Annual 4,500
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,195 451,641
kWh
Electricity Demand $14,750 1,764
kW-mo/yr
Electricity Fees $1,159 -
Natural Gas $8,175 1,566
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $63,240 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $63,240

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Primary Product Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,540 $750 $610
18,000
kWh
$930
-
kW-mo/yr
- - -
02 2.7243: Improve air circulation with destratification fans / other methods $1,120 $2,100 - - $1,120
-
MMBtu
- -
03 2.8121: Apply for tax-free status for energy purchases $6,580 $950 - - - $6,580 -
04 4.652: Replace existing equipment with more suitable substitutes $54,000 $16,000 - - - - $54,000
TOTAL RECOMMENDED $63,240 $19,800 $610
18,000
kWh
$930
-
kW-mo/yr
$1,120
-
MMBtu
$6,580 $54,000
TOTAL IMPLEMENTED $63,240 $19,800 $610
18,000
kWh
$930
-
kW-mo/yr
$1,120
-
MMBtu
$6,580 $54,000
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs