ITAC Assessment: NC0645
ITAC logo
ITAC Assessment: NC0645
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Milk water and juices
NAICS 311511: Fluid Milk Manufacturing
SIC 2026: Fluid Milk
Sales Range $50
M
to 100
M
# of Employees 70
Plant Area 90,000
ft2
Annual Production 12,000
Tgal
Production Hrs. Annual 7,200
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $192,758 5,331,288
kWh
Electricity Demand $253,105 26,639
kW-mo/yr
Electricity Fees $3,318 -
Natural Gas $92,699 17,779
MMBtu
Waste Disposal Costs
Water Usage $276,539 25,694
Tgal
TOTAL YEARLY COSTS $818,419
RECOMMENDED SAVINGS* $69,246 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,683

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $16,683 $40,000 $10,433
288,204
kWh
$6,250
-
kW-mo/yr
-
02 2.2437: Recover waste heat from equipment $51,058 $178,000 $2,502
69,133
kWh
$1,500
-
kW-mo/yr
$47,056
-
MMBtu
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,505 $5,000 $716
19,872
kWh
$789
-
kW-mo/yr
-
TOTAL RECOMMENDED $69,246 $223,000 $13,651
377,209
kWh
$8,539
-
kW-mo/yr
$47,056
-
MMBtu
TOTAL IMPLEMENTED $16,683 $40,000 $10,433
288,204
kWh
$6,250
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs