Assessment Year | 2019 |
---|---|
Principal Product | Milk water and juices |
NAICS | 311511: Fluid Milk Manufacturing |
SIC | 2026: Fluid Milk |
Sales Range | $50 M to 100M |
# of Employees | 70 |
Plant Area |
90,000
ft2
|
Annual Production | 12,000
Tgal
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $192,758 | 5,331,288 |
kWh
|
$0.036 | |
Electricity Demand | $253,105 | 26,639 |
kW-mo/yr
|
$9.50 | |
Electricity Fees | $3,318 | - |
|
- | |
Natural Gas | $92,699 | 17,779 |
MMBtu
|
$5.21 | |
Waste Disposal Costs | |||||
Water Usage | $276,539 | 25,694 |
Tgal
|
$10.76 | |
TOTAL YEARLY COSTS | $818,419 | ||||
RECOMMENDED SAVINGS* | $69,246 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $16,683 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $16,683 | $40,000 |
$10,433
288,204
kWh
|
$6,250
-
kW-mo/yr
|
- | |
02 | 2.2437: Recover waste heat from equipment | $51,058 | $178,000 |
$2,502
69,133
kWh
|
$1,500
-
kW-mo/yr
|
$47,056
-
MMBtu
|
|
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,505 | $5,000 |
$716
19,872
kWh
|
$789
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $69,246 | $223,000 |
$13,651
377,209
kWh
|
$8,539
-
kW-mo/yr
|
$47,056
-
MMBtu
|
||
TOTAL IMPLEMENTED | $16,683 | $40,000 |
$10,433
288,204
kWh
|
$6,250
-
kW-mo/yr
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs