ITAC Assessment: UM0159
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Aluminum Castings
NAICS
n/a
SIC 3363: Aluminum Die-Castings
Sales Range $50
M
to 100
M
# of Employees 235
Plant Area 80,000
ft2
Annual Production 1,250,000
ton
Production Hrs. Annual 6,000
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $500,539 14,041,618
kWh
Electricity Demand $244,320 26,016
kW-mo/yr
Electricity Fees $25,239 -
Natural Gas $389,722 129,649
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $206,171 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $110,445

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings
01 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,800 $200 $1,800
50,410
kWh
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $172 $50 $115
3,224
kWh
$57
-
kW-mo/yr
- -
03 2.1133: Adjust burners for efficient operation $10,836 $3,000 - - $10,836
-
MMBtu
-
04 2.1131: Repair faulty insulation in furnaces, boilers, etc $4,390 $4,000 - - $4,390
-
MMBtu
-
05 2.1121: Use insulation in furnaces to facilitate heating / cooling $4,800 $8,000 - - $4,800
-
MMBtu
-
06 2.2414: Use waste heat from hot flue gases to preheat $88,447 $27,000 - - $88,447
-
MMBtu
-
07 3.4111: Use closed cycle process to minimize waste water production $95,726 $35,000 - - - $95,726
-
gal
TOTAL RECOMMENDED $206,171 $77,250 $1,915
53,634
kWh
$57
-
kW-mo/yr
$108,473
-
MMBtu
$95,726
-
gal
TOTAL IMPLEMENTED $110,445 $42,250 $1,915
53,634
kWh
$57
-
kW-mo/yr
$108,473
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs