Assessment Year | 2000 |
---|---|
Principal Product | Chemical Products |
NAICS |
n/a
|
SIC | 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 42 |
Plant Area |
75,000
ft2
|
Annual Production | 5,000
Tgal
|
Production Hrs. Annual | 2,340
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $19,354 | 472,157 |
kWh
|
$0.041 |
Electricity Demand | $18,947 | 1,956 |
kW-mo/yr
|
$9.69 |
Electricity Fees | $1,643 | - |
|
- |
Natural Gas | $16,786 | 3,572 |
MMBtu
|
$4.70 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $164,012 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $149,109 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $188 | $200 |
$114
3,810
kWh
|
$74
-
kW-mo/yr
|
- | - | - | - | - | - | |
02 | 2.2136: Install / repair insulation on steam lines | $282 | $618 | - | - |
$282
-
MMBtu
|
- | - | - | - | - | |
03 | 3.1162: Use less wasteful packaging | $147,272 | - | - | - | - | - | - | - | $147,272 | - | |
04 | 3.4115: Recover and reuse cooling water | $1,649 | $3,826 | - | - | - |
$976
-
Tgal
|
- | - | - |
$673
-
Tgal
|
|
05 | 3.4155: Meter waste water | $1,288 | $500 | - | - | - | - | - | $1,288 | - | - | |
06 | 4.111: Add equipment/ operators to reduce production bottleneck | $13,333 | $1,200 | - | - | - | - | $13,333 | - | - | - | |
TOTAL RECOMMENDED | $164,012 | $6,344 |
$114
3,810
kWh
|
$74
-
kW-mo/yr
|
$282
-
MMBtu
|
$976
-
Tgal
|
$13,333 | $1,288 | $147,272 |
$673
-
Tgal
|
||
TOTAL IMPLEMENTED | $149,109 | $4,026 |
$114
3,810
kWh
|
$74
-
kW-mo/yr
|
- |
$976
-
Tgal
|
- | - | $147,272 |
$673
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs