ITAC Assessment: UM0140
ITAC logo
ITAC Assessment: UM0140
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Processed Steel Coils
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 370,420
ft2
Annual Production 34,000
ton
Production Hrs. Annual 4,160
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $343,779 12,051,583
kWh
Electricity Demand $570,907 33,864
kW-mo/yr
Electricity Fees $(-21,002.0) -
Natural Gas $639,862 151,567
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $315,502 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings By-product Production Savings
01 2.7111: Reduce illumination to minimum necessary levels $18,168 $780 $8,884
316,237
kWh
$9,284
-
kW-mo/yr
- - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,110 $600 $877
29,601
kWh
$1,233
-
kW-mo/yr
- - - -
03 2.7291: Reschedule and rearrange multiple-source heating systems $27,426 $13,000 - - $27,426
-
MMBtu
- - -
04 2.1243: Use heat from boiler blowdown to preheat boiler feed water $2,688 $3,600 - - $2,688
-
MMBtu
- - -
05 3.3122: Use filtration, centrifuging to remove contaminants $225,811 $90,000 - - - $225,811
-
gal
- -
06 3.5315: Lease / purchase baler; sell cardboard to recycler $2,613 - - - - - $2,613
-
lb
-
07 4.454: Modify startup/shutdown times $36,686 - - - - - - $36,686
TOTAL RECOMMENDED $315,502 $107,980 $9,761
345,838
kWh
$10,517
-
kW-mo/yr
$30,114
-
MMBtu
$225,811
-
gal
$2,613
-
lb
$36,686
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs