ITAC Assessment: UM0131
ITAC logo
ITAC Assessment: UM0131
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Plating Chemicals
NAICS
n/a
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 257,000
ft2
Annual Production 17,100,000
lb
Production Hrs. Annual 2,340
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $176,640 5,900,645
kWh
Electricity Demand $216,623 20,148
kW-mo/yr
Electricity Fees $11,674 -
Natural Gas $116,368 43,408
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $101,668 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $15,173 $10,972 n/a $4,199
142,145
kWh
$10,974
-
kW-mo/yr
- - -
02 2.7135: Install occupancy sensors $616 $1,400 n/a $616
20,809
kWh
- - - -
03 2.7221: Lower temperature during the winter season and vice-versa $2,228 - n/a - - $2,228
-
MMBtu
- -
04 2.2136: Install / repair insulation on steam lines $202 $510 n/a - - $202
-
MMBtu
- -
05 2.2113: Repair or replace steam traps $2,646 $5,280 n/a - - $2,646
-
MMBtu
- -
06 2.2121: Increase amount of condensate returned $14,658 $6,690 n/a - - $6,795
-
MMBtu
$7,863
-
Tgal
-
07 3.4155: Meter waste water $2,154 $500 n/a - - - $2,154
-
Tgal
-
08 4.521: Clear and rent existing space $63,991 $63,991 n/a - - - - $63,991
TOTAL RECOMMENDED $101,668 $89,343 $4,815
162,954
kWh
$10,974
-
kW-mo/yr
$11,871
-
MMBtu
$10,017
-
Tgal
$63,991
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs