ITAC Assessment: UM0127
ITAC logo
ITAC Assessment: UM0127
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Aluminum Extrusions
NAICS
n/a
SIC 3354: Aluminum Extruded Products
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 137,070
ft2
Annual Production 18,000,000
lb
Production Hrs. Annual 6,864
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $428,080 4,388,628
kWh
Electricity Fees $(-10,757.0) -
Natural Gas $132,827 34,746
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $73,942 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,907 $5,428 $240
2,345
kWh
- - - $2,667 - -
02 2.8114: Change rate schedules or other changes in utility service $16,282 $250 - $16,282 - - - - -
03 2.2414: Use waste heat from hot flue gases to preheat $11,496 $5,000 - - $11,496
-
MMBtu
- - - -
04 3.3122: Use filtration, centrifuging to remove contaminants $30,552 $35,000 - - - $15,200
-
gal
- $15,352 -
05 4.111: Add equipment/ operators to reduce production bottleneck $12,705 $13,600 - - - - - - $12,705
TOTAL RECOMMENDED $73,942 $59,278 $240
2,345
kWh
$16,282 $11,496
-
MMBtu
$15,200
-
gal
$2,667 $15,352 $12,705
TOTAL IMPLEMENTED - - - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs