ITAC Assessment: UM0119
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Stamped Metal Parts
NAICS
n/a
SIC 3465: Automotive Stampings
Sales Range $50
M
to 100
M
# of Employees 400
Plant Area 618,496
ft2
Annual Production 1,100,000
pieces
Production Hrs. Annual 6,912
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $530,969 15,705,745
kWh
Electricity Demand $261,590 31,716
kW-mo/yr
Electricity Fees $43,332 -
Natural Gas $384,842 124,143
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $382,118 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,067

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Personnel Changes Savings
01 2.4133: Use most efficient type of electric motors $5,067 $11,283 $3,930
74,150
kWh
$1,137
-
kW-mo/yr
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $10,659 $30,946 $7,710
201,055
kWh
$2,949
-
kW-mo/yr
- - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $19,816 $1,800 $15,838
298,359
kWh
$3,978
-
kW-mo/yr
- - - -
04 2.7233: Use properly designed and sized hvac equipment $24,125 $3,800 - - $24,125
-
MMBtu
- - -
05 3.4131: Minimize contamination of water before treatment $200 $132 - - - $200
-
Tgal
- -
06 3.3122: Use filtration, centrifuging to remove contaminants $2,707 $11,000 - - - - $2,707
-
gal
-
07 4.511: Expand operations into unused space $319,544 - - - - - - $319,544
TOTAL RECOMMENDED $382,118 $58,961 $27,478
573,564
kWh
$8,064
-
kW-mo/yr
$24,125
-
MMBtu
$200
-
Tgal
$2,707
-
gal
$319,544
TOTAL IMPLEMENTED $5,067 $11,283 $3,930
74,150
kWh
$1,137
-
kW-mo/yr
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs