Assessment Year | 1998 |
---|---|
Principal Product | Stamped Metal Parts |
NAICS |
n/a
|
SIC | 3465: Automotive Stampings |
Sales Range | $50 M to 100M |
# of Employees | 400 |
Plant Area |
618,496
ft2
|
Annual Production | 1,100,000
pieces
|
Production Hrs. Annual | 6,912
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $530,969 | 15,705,745 |
kWh
|
$0.034 |
Electricity Demand | $261,590 | 31,716 |
kW-mo/yr
|
$8.25 |
Electricity Fees | $43,332 | - |
|
- |
Natural Gas | $384,842 | 124,143 |
MMBtu
|
$3.10 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $382,118 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,067 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $5,067 | $11,283 |
$3,930
74,150
kWh
|
$1,137
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,659 | $30,946 |
$7,710
201,055
kWh
|
$2,949
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $19,816 | $1,800 |
$15,838
298,359
kWh
|
$3,978
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.7233: Use properly designed and sized hvac equipment | $24,125 | $3,800 | - | - |
$24,125
-
MMBtu
|
- | - | - | |
05 | 3.4131: Minimize contamination of water before treatment | $200 | $132 | - | - | - |
$200
-
Tgal
|
- | - | |
06 | 3.3122: Use filtration, centrifuging to remove contaminants | $2,707 | $11,000 | - | - | - | - |
$2,707
-
gal
|
- | |
07 | 4.511: Expand operations into unused space | $319,544 | - | - | - | - | - | - | $319,544 | |
TOTAL RECOMMENDED | $382,118 | $58,961 |
$27,478
573,564
kWh
|
$8,064
-
kW-mo/yr
|
$24,125
-
MMBtu
|
$200
-
Tgal
|
$2,707
-
gal
|
$319,544 | ||
TOTAL IMPLEMENTED | $5,067 | $11,283 |
$3,930
74,150
kWh
|
$1,137
-
kW-mo/yr
|
- | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs