Assessment Year | 1998 |
---|---|
Principal Product | Material Handling Equipment |
NAICS |
n/a
|
SIC | 3535: Conveyors and Conveying Equipment |
Sales Range | $10 M to 50M |
# of Employees | 132 |
Plant Area |
50,000
ft2
|
Annual Production | 100
units
|
Production Hrs. Annual | 4,862
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $44,710 | 1,118,113 |
kWh
|
$0.040 |
Electricity Demand | $26,993 | 2,328 |
kW-mo/yr
|
$11.59 |
Electricity Fees | $1,485 | - |
|
- |
Natural Gas | $16,069 | 4,068 |
MMBtu
|
$3.95 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $8,059 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,803 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $929 | $100 |
$553
3,517
kWh
|
$376
-
kW-mo/yr
|
- | - | |
02 | 2.4226: Use / purchase optimum sized compressor | $1,055 | $11,155 |
$622
15,240
kWh
|
$433
-
kW-mo/yr
|
- | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $900 | $50 | n/a |
$900
12,896
kWh
|
- | - | - |
04 | 2.4221: Install compressor air intakes in coolest locations | $301 | $800 |
$176
4,396
kWh
|
$125
-
kW-mo/yr
|
- | - | |
05 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $3,480 | $1,000 | - | - |
$3,480
-
Tgal
|
- | |
06 | 4.514: Re-arrange equipment layout to reduce handling costs | $1,394 | $624 | - | - | - | $1,394 | |
TOTAL RECOMMENDED | $8,059 | $13,729 |
$2,251
36,049
kWh
|
$934
-
kW-mo/yr
|
$3,480
-
Tgal
|
$1,394 | ||
TOTAL IMPLEMENTED | $5,803 | $1,724 |
$553
3,517
kWh
|
$376
-
kW-mo/yr
|
$3,480
-
Tgal
|
$1,394 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs