ITAC Assessment: UM0110
ITAC logo
ITAC Assessment: UM0110
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Material Handling Equipment
NAICS
n/a
SIC 3535: Conveyors and Conveying Equipment
Sales Range $10
M
to 50
M
# of Employees 132
Plant Area 50,000
ft2
Annual Production 100
units
Production Hrs. Annual 4,862
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $44,710 1,118,113
kWh
Electricity Demand $26,993 2,328
kW-mo/yr
Electricity Fees $1,485 -
Natural Gas $16,069 4,068
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,059 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,803

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Primary Product Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $929 $100 $553
3,517
kWh
$376
-
kW-mo/yr
- -
02 2.4226: Use / purchase optimum sized compressor $1,055 $11,155 $622
15,240
kWh
$433
-
kW-mo/yr
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $900 $50 n/a $900
12,896
kWh
- - -
04 2.4221: Install compressor air intakes in coolest locations $301 $800 $176
4,396
kWh
$125
-
kW-mo/yr
- -
05 3.2123: Convert to high volume low pressure (hvlp) paint guns $3,480 $1,000 - - $3,480
-
Tgal
-
06 4.514: Re-arrange equipment layout to reduce handling costs $1,394 $624 - - - $1,394
TOTAL RECOMMENDED $8,059 $13,729 $2,251
36,049
kWh
$934
-
kW-mo/yr
$3,480
-
Tgal
$1,394
TOTAL IMPLEMENTED $5,803 $1,724 $553
3,517
kWh
$376
-
kW-mo/yr
$3,480
-
Tgal
$1,394
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs