ITAC Assessment: UM0109
ITAC logo
ITAC Assessment: UM0109
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Prototype Automotive Parts
NAICS
n/a
SIC 3711: Motor Vehicles and Passenger Car Bodies
Sales Range $5
M
to 10
M
# of Employees 58
Plant Area 37,000
ft2
Annual Production 100
units
Production Hrs. Annual 3,718
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $60,654 618,992
kWh
Electricity Fees $1,583 -
Natural Gas $13,690 3,280
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,452 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,618

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Disposal Savings Personnel Changes Savings
01 2.4133: Use most efficient type of electric motors $168 $208 $168
1,758
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $924 $2,743 $924
9,379
kWh
- -
03 2.7135: Install occupancy sensors $851 $400 $851
8,792
kWh
- -
04 2.7145: Install skylights $504 $2,100 $504
6,448
kWh
- -
05 3.4115: Recover and reuse cooling water $555 $1,200 - $555
-
Tgal
-
06 4.513: Re-arrange equipment layout to reduce labor costs $44,450 $100 - - $44,450
TOTAL RECOMMENDED $47,452 $6,751 $2,447
26,377
kWh
$555
-
Tgal
$44,450
TOTAL IMPLEMENTED $44,618 $308 $168
1,758
kWh
- $44,450
Yearly Savings* Imp'd Cost* Electricity Usage Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs