ITAC Assessment: UM0097
ITAC logo
ITAC Assessment: UM0097
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Dry Baking Goods
NAICS
n/a
SIC 2041: Flour and Other Grain Mill Products
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 262,750
ft2
Annual Production 14,000,000
units
Production Hrs. Annual 6,468
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $269,371 7,924,971
kWh
Electricity Demand $340,527 39,252
kW-mo/yr
Electricity Fees $(-426,331.0) -
Natural Gas $45,272 1,919
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $198,530 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $193,361

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings
01 2.4133: Use most efficient type of electric motors $2,449 $4,445 $1,595
46,893
kWh
$854
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,340 $1,500 $3,340
40,445
kWh
- - -
03 2.3132: Recharge batteries on during off-peak demand periods $4,254 $2,400 - $4,254
-
kW-mo/yr
- -
04 3.4151: Minimize water usage $915 - - - $915
-
Tgal
-
05 4.441: Install automatic packing equipment $187,572 $28,169 - - - $187,572
TOTAL RECOMMENDED $198,530 $36,514 $4,935
87,338
kWh
$5,108
-
kW-mo/yr
$915
-
Tgal
$187,572
TOTAL IMPLEMENTED $193,361 $34,114 $4,935
87,338
kWh
$854
-
kW-mo/yr
- $187,572
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs