ITAC Assessment: UM0090
ITAC logo
ITAC Assessment: UM0090
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Steel Stamped Items
NAICS
n/a
SIC 3452: Bolts, Nuts, Screws, Rivets, and Washers
Sales Range $10
M
to 50
M
# of Employees 67
Plant Area 65,000
ft2
Annual Production 307,000,000
pieces
Production Hrs. Annual 2,250
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,998 1,283,705
kWh
Electricity Demand $84,811 4,956
kW-mo/yr
Electricity Fees $1,441 -
Natural Gas $14,518 3,652
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,153 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,197

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Primary Raw Material Savings Primary Product Savings
01 2.4133: Use most efficient type of electric motors $1,096 $1,755 $493
16,706
kWh
$603
-
kW-mo/yr
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,710 $4,546 $569
19,343
kWh
$1,141
-
kW-mo/yr
- - - -
03 2.7135: Install occupancy sensors $113 $200 $113
3,810
kWh
- - - - -
04 2.2531: Re-size charging openings or add movable cover or door $1,141 $2,000 - - $1,141
-
MMBtu
- - -
05 3.5315: Lease / purchase baler; sell cardboard to recycler $5,250 - - - - $5,250
-
lb
- -
06 4.621: Use fixtures to reduce machine changeout times $19,843 $14,648 - - - - $14,063 $5,780
TOTAL RECOMMENDED $29,153 $23,149 $1,175
39,859
kWh
$1,744
-
kW-mo/yr
$1,141
-
MMBtu
$5,250
-
lb
$14,063 $5,780
TOTAL IMPLEMENTED $9,197 $8,301 $1,062
36,049
kWh
$1,744
-
kW-mo/yr
$1,141
-
MMBtu
$5,250
-
lb
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Primary Raw Material Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs