ITAC Assessment: UM0066
ITAC logo
ITAC Assessment: UM0066
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Fasteners
NAICS
n/a
SIC 3452: Bolts, Nuts, Screws, Rivets, and Washers
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 76,000
ft2
Annual Production 50,000,000
lb
Production Hrs. Annual 6,396
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $224,641 8,844,080
kWh
Electricity Demand $257,074 15,828
kW-mo/yr
Electricity Fees $6,638 -
Natural Gas $54,818 12,825
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,395 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Natural Gas Savings Water Disposal Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.3212: Optimize plant power factor $9,433 $6,541 - - $9,433 -
02 2.2511: Insulate bare equipment $256 $990 $256
-
MMBtu
- - -
03 2.7491: Insulate glazing, walls, ceilings, and roofs $8,215 $39,138 $8,215
-
MMBtu
- - -
04 3.2136: Use "wash-less" processing equipment $14,491 $11,000 - $11,711
-
Tgal
- $2,780
TOTAL RECOMMENDED $32,395 $57,669 $8,471
-
MMBtu
$11,711
-
Tgal
$9,433 $2,780
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs