ITAC Assessment: OK0104
ITAC logo
ITAC Assessment: OK0104
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product METAL BOTTLE CAPS
NAICS
n/a
SIC 3466: Crowns and Closures
Sales Range $1
M
to 5
M
# of Employees 120
Plant Area
n/a
Annual Production 20,000,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $241,035 6,296,600
kWh
Natural Gas $82,143 25,049
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,058 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,202

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $2,323 $585 $1,287
48,359
kWh
$1,036
-
MMBtu
02 2.1233: Analyze flue gas for proper air/fuel ratio $4,856 $450 - $4,856
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $995 $750 $995
37,222
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $139 $148 $139
3,224
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $174 $425 $174
4,103
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,571 $65 $2,571
38,980
kWh
-
TOTAL RECOMMENDED $11,058 $2,423 $5,166
131,888
kWh
$5,892
-
MMBtu
TOTAL IMPLEMENTED $6,202 $1,973 $5,166
131,888
kWh
$1,036
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs