ITAC Assessment: UM0065
ITAC logo
ITAC Assessment: UM0065
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Automotive Bright Plating
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area 65,000
ft2
Annual Production 892,500
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $209,161 8,764,068
kWh
Electricity Demand $162,935 9,384
kW-mo/yr
Electricity Fees $(-144,405.0) -
Natural Gas $121,068 72,697
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,427 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 2.4133: Use most efficient type of electric motors $293 $300 $151
4,982
kWh
$142
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,223 $5,402 $3,516
61,254
kWh
$1,707
-
kW-mo/yr
- -
03 2.7491: Insulate glazing, walls, ceilings, and roofs $464 $990 - - $464
-
MMBtu
-
04 3.5311: Recover and reuse waste material $42,447 $990 - - - $42,447
-
Tgal
TOTAL RECOMMENDED $48,427 $7,682 $3,667
66,236
kWh
$1,849
-
kW-mo/yr
$464
-
MMBtu
$42,447
-
Tgal
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs