ITAC Assessment: UM0061
ITAC logo
ITAC Assessment: UM0061
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Automotive Stampings
NAICS
n/a
SIC 3465: Automotive Stampings
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 44,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $40,994 386,577
kWh
Electricity Fees $3,124 -
Natural Gas $12,635 3,135
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,102 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Disposal Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $4,205 $3,740 $4,205
41,325
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,628 $12,400 $2,628
26,377
kWh
- -
03 3.4156: Use flow control valves on equipment to optimize water use $840 $350 - $840
-
Tgal
-
04 3.5315: Lease / purchase baler; sell cardboard to recycler $429 - - - $429
-
lb
TOTAL RECOMMENDED $8,102 $16,490 $6,833
67,702
kWh
$840
-
Tgal
$429
-
lb
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs