ITAC Assessment: GT0156
ITAC logo
ITAC Assessment: GT0156
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product WOVEN LINEN & POLYESTER
NAICS
n/a
SIC 2221: Broadwoven Fabric Mills, Manmade Fiber and Silk
Sales Range $10
M
to 50
M
# of Employees 361
Plant Area
n/a
Annual Production 3,200
ton
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,091,144 27,900,059
kWh
Natural Gas $153,366 43,813
MMBtu
Fuel Oil #6 $34,255 6,506
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $78,713 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $57,384

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings
01 2.7226: Use computer programs to optimize hvac performance $7,784 $12,000 $7,784
341,442
kWh
- -
02 2.7226: Use computer programs to optimize hvac performance $23,650 - $23,650
1,037,515
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $10,509 $8,996 $10,509
268,757
kWh
- -
04 2.3191: Use demand controller or load shedder $10,820 $9,000 $10,820
-
kWh
- -
05 2.4133: Use most efficient type of electric motors $21,395 $132,168 $21,395
547,186
kWh
- -
06 2.1233: Analyze flue gas for proper air/fuel ratio $3,573 $500 - $2,921
-
MMBtu
$652
-
MMBtu
07 2.2511: Insulate bare equipment $982 $565 - $803
-
MMBtu
$179
-
MMBtu
TOTAL RECOMMENDED $78,713 $163,229 $74,158
2,194,900
kWh
$3,724
-
MMBtu
$831
-
MMBtu
TOTAL IMPLEMENTED $57,384 $145,233 $52,829
1,926,143
kWh
$3,724
-
MMBtu
$831
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs