Assessment Year | 1983 |
---|---|
Principal Product | WOVEN LINEN & POLYESTER |
NAICS |
n/a
|
SIC | 2221: Broadwoven Fabric Mills, Manmade Fiber and Silk |
Sales Range | $10 M to 50M |
# of Employees | 361 |
Plant Area |
n/a
|
Annual Production | 3,200
ton
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,091,144 | 27,900,059 |
kWh
|
$0.039 |
Natural Gas | $153,366 | 43,813 |
MMBtu
|
$3.50 |
Fuel Oil #6 | $34,255 | 6,506 |
MMBtu
|
$5.27 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $78,713 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $57,384 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #6 Savings |
---|---|---|---|---|---|---|---|
01 | 2.7226: Use computer programs to optimize hvac performance | $7,784 | $12,000 |
$7,784
341,442
kWh
|
- | - | |
02 | 2.7226: Use computer programs to optimize hvac performance | $23,650 | - |
$23,650
1,037,515
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,509 | $8,996 |
$10,509
268,757
kWh
|
- | - | |
04 | 2.3191: Use demand controller or load shedder | $10,820 | $9,000 |
$10,820
-
kWh
|
- | - | |
05 | 2.4133: Use most efficient type of electric motors | $21,395 | $132,168 |
$21,395
547,186
kWh
|
- | - | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,573 | $500 | - |
$2,921
-
MMBtu
|
$652
-
MMBtu
|
|
07 | 2.2511: Insulate bare equipment | $982 | $565 | - |
$803
-
MMBtu
|
$179
-
MMBtu
|
|
TOTAL RECOMMENDED | $78,713 | $163,229 |
$74,158
2,194,900
kWh
|
$3,724
-
MMBtu
|
$831
-
MMBtu
|
||
TOTAL IMPLEMENTED | $57,384 | $145,233 |
$52,829
1,926,143
kWh
|
$3,724
-
MMBtu
|
$831
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #6 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs