ITAC Assessment: UM0060
ITAC logo
ITAC Assessment: UM0060
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Aluminum Die Castings
NAICS
n/a
SIC 3363: Aluminum Die-Castings
Sales Range $10
M
to 50
M
# of Employees 89
Plant Area 32,500
ft2
Annual Production 7,800,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $115,632 3,854,631
kWh
Electricity Demand $80,986 6,696
kW-mo/yr
Electricity Fees $8,319 -
Natural Gas $47,700 38,922
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,325 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,346

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings
01 2.4133: Use most efficient type of electric motors $1,500 $1,607 $1,018
29,015
kWh
$482
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,561 $12,818 $2,681
50,703
kWh
$880
-
kW-mo/yr
- -
03 2.3212: Optimize plant power factor $2,418 $6,182 - - $2,418 -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,807 $2,550 $1,226
34,877
kWh
$581
-
kW-mo/yr
- -
05 3.4113: Treat and reuse rinse waters $1,039 $1,000 - - - $1,039
-
Tgal
TOTAL RECOMMENDED $10,325 $24,157 $4,925
114,595
kWh
$1,943
-
kW-mo/yr
$2,418 $1,039
-
Tgal
TOTAL IMPLEMENTED $4,346 $5,157 $2,244
63,892
kWh
$1,063
-
kW-mo/yr
- $1,039
-
Tgal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs