ITAC Assessment: UM0057
ITAC logo
ITAC Assessment: UM0057
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Printed Material
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 90,000
ft2
Annual Production 500,000,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $99,463 2,553,634
kWh
Electricity Demand $69,374 8,064
kW-mo/yr
Electricity Fees $(-5,024.0) -
Natural Gas $11,542 2,202
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,573 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,261

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4133: Use most efficient type of electric motors $611 $835 $439
11,723
kWh
$172
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $9,930 $24,756 $6,932
184,056
kWh
$2,998
-
kW-mo/yr
03 2.3212: Optimize plant power factor $4,701 $3,210 - $4,701
-
kW-mo/yr
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,331 $100 $1,948
30,481
kWh
$383
-
kW-mo/yr
TOTAL RECOMMENDED $17,573 $28,901 $9,319
226,260
kWh
$8,254
-
kW-mo/yr
TOTAL IMPLEMENTED $12,261 $24,856 $8,880
214,537
kWh
$3,381
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs