Assessment Year | 1996 |
---|---|
Principal Product | Flexible Packaging Printing and Laminating |
NAICS |
n/a
|
SIC | 2643: |
Sales Range | $50 M to 100M |
# of Employees | 185 |
Plant Area |
127,480
ft2
|
Annual Production | 575,789
thousand feet
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $214,222 | 6,041,618 |
kWh
|
$0.035 |
Electricity Demand | $30,157 | 16,302 |
kW-mo/yr
|
$1.85 |
Electricity Fees | $106,767 | - |
|
- |
Natural Gas | $209,057 | 47,921 |
MMBtu
|
$4.36 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $213,507 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $27,542 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings | Ancillary Material Cost Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,113 | $250 |
$2,316
39,859
kWh
|
$797
-
kW-mo/yr
|
- | - | - | - | - | - | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,277 | - |
$2,390
41,325
kWh
|
$887
-
kW-mo/yr
|
- | - | - | - | - | - | - | |
03 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $3,431 | $1,000 | - | - |
$3,431
-
MMBtu
|
- | - | - | - | - | - | |
04 | 3.5121: Recycle waste ink and cleanup solvent | $179,257 | $11,000 |
$(-27.0)
(-586)
kWh
|
- | - | - |
$31,306
-
lb
|
$(-4,160.0) | $152,138 | - | - | |
05 | 3.8133: Convert to aqueous cleaning | $24,429 | $6,000 | - | - | - |
$19,760
-
gal
|
- | - | $15,600 | $(-10,920.0) |
$(-11.0)
-
Tgal
|
|
TOTAL RECOMMENDED | $213,507 | $18,250 |
$4,679
80,598
kWh
|
$1,684
-
kW-mo/yr
|
$3,431
-
MMBtu
|
$19,760
-
gal
|
$31,306
-
lb
|
$(-4,160.0) | $167,738 | $(-10,920.0) |
$(-11.0)
-
Tgal
|
||
TOTAL IMPLEMENTED | $27,542 | $6,250 |
$2,316
39,859
kWh
|
$797
-
kW-mo/yr
|
- |
$19,760
-
gal
|
- | - | $15,600 | $(-10,920.0) |
$(-11.0)
-
Tgal
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs